gantry cranedelivery and installation support for one 40-ton rail-mounted unit were completed by TAIDA GLOBAL on May 18, 2026, for a railway logistics terminal project in East Java, Indonesia.
The project included the positioning of the crane legs, lifting of the main girders, structural connection, platform installation, electrical interface inspection, and preparation for commissioning.
During the erection process, multiple mobile cranes were coordinated to lift and position the main girders. The lifting points, structural balance, crane synchronization, working area, and communication between operators were carefully controlled.
40t rail-mounted gantry crane:
1. Equipment type: Rail-mounted gantry crane
2. Rated lifting capacity: 40 t
3. Power source: Three-phase AC 380 V, 50 Hz
4. Working class options: A3 / A5 / A6 / A7 / A8
5. Control mode: Ground remote control or cabin control
6. Operating temperature: -20°C to +40°C
Before commissioning, the main structure, connecting bolts, traveling mechanism, electrical system, safety platforms, ladders, and protection devices were inspected.
TAIDA GLOBAL supports customers throughout equipment selection, technical coordination, production follow-up, quality inspection, transportation, installation, and commissioning preparation.Same Quality Standard. Lower Total Procurement Cost.